Deck footings and posts

How many footings your deck needs, how big and deep each pad is, and the posts that stand on them. Put in your deck and your soil: the plan shows every footing, sized from the building code’s stump table.

For builders · Footings · Updated 7 Nov 2026 · Sizes in mm · Class A and S sites · Concept figures, not a sign-off

Footings for your deck

Deck footing calculator

Put in the deck’s size and height, its frame and your soil. The designer’s engine lays out the bearers and posts, and each footing is sized from the building code’s stump table.

Deck size
Ground to the top of the boards, 150 to 1,000 mm.
A soil test, or the site classification for your house, tells you. Not sure? Leave it.
What sits on the deck
Footings10footings

On 3 bearer rows, one under each post.

Each pad, if Class A or S250 × 250mm

Or 300 mm round, 250 mm deep.

Concrete17bags

20 kg bags for 10 square pads, 0.16 m³.

On a 4.8 × 3.6 m deck, 600 mm high, on a treated pine frame: 10 footings on 3 bearer rows. If your site is Class A or S, each is a 250 × 250 mm pad (or 300 mm round), 250 mm deep: 17 bags of concrete in all.

If your site is Class A or S

These pads are from the building code’s table for Class A and S sites. A soil test, or the site classification for your house, tells you the class. On any other class an engineer designs the footings.

Footing plan

4,800 × 3,600 mm · treated pine · 600 mm high
HOUSE12345678910
Area each footing carries
Up to 2.8 m², 1.5 m² typical.
Post height
247 mm, ground to the underside of the bearer.
Post
90 × 90 H4 treated pine post, F7.
Post height check
Braced, a 90 × 90 F7 post carrying up to 5 m² can stand 4,100 mm high (Timber Queensland, no roof, wind up to N3). These posts carry up to 2.8 m² and stand 247 mm, well inside that. As unbraced stumps set in the ground, keep the deck no higher than 15 × 90 = 1,350 mm: this one is.
Ground clearance
247 mm under the frame. The Housing Provisions ask for at least 150 mm, or 400 mm where termite inspection is needed.
If the posts go in the ground
Embed each at least 450 mm (450 mm, or 30% of the height above ground), in H5 or in-ground Class 1 timber, on 100 mm of coarse gravel.
Footings for a 4.8 × 3.6 m deck, 600 mm high: the area each carries, and its pad from the building code’s stump table if the site is Class A or S
FootingCarries, m²Square pad, mmRound pad, mmDepth, mm
11.1250 × 250300250
22.2250 × 250300250
31.1250 × 250300250
41.5250 × 250300250
52.8250 × 250300250
62.8250 × 250300250
71.5250 × 250300250
81.1250 × 250300250
92.2250 × 250300250
101.1250 × 250300250

Concrete, worked out

Square pads: 10 × 250 × 250 × 250 mm = 0.16 m³. At 105 bags of 20 kg to the cubic metre (the designer’s planning rate), that’s 17 bags. Round pads take 0.18 m³, or 19 bags.

The building code asks for N20 concrete: 20 MPa at 28 days, 20 mm aggregate, 100 mm slump. The designer’s deck pack allows a bigger pad and more concrete than the table’s minimum, as a planning allowance.

Want it drawn, counted and cut?The deck designer frames this deck, counts every post, bearer and joist, and gives you a materials list and a cut list. Its deck pack counts the footings and concrete as a planning allowance. The designer is free. Your deck pack opens with your email and a code texted to your mobile.

Open this deck in the designer

How deep do deck footings need to be?

Depth

On a Class A or S site, the building code’s stump table gives a 250 mm pad footing depth for a deck post with no roof on it. Its pad table for house frames goes further and puts the bottom of the pad at least 400 mm below the ground, and a certifier may ask for that deeper figure. On loose sand, or ground that wind or water wears away, the bottom of every footing is at least 300 mm below the finished ground. Reactive clay, soft ground and uplift go deeper, to an engineer’s design.

The two depths are printed differently. Table 4.2.13a gives one “pad footing depth” of 250 mm. Table 4.2.13g, for pads under a clad house frame, gives the pad’s thickness and, separately, the depth to its base.

Before you pour

  • Strip the topsoil with grass roots from under each footing.
  • Stand the pad on natural ground that bears at least 100 kPa. On Class A and S sites, controlled sand fill will do.
  • Set a stump into the ground at least 450 mm, or 30% of its height above ground, whichever is more.
  • On rock, the pad may be halved, but never below 250 × 250 mm or 300 mm round.
  • Use N20 concrete: 20 MPa, 20 mm aggregate, 100 mm slump.

ABCB Housing Provisions 4.2.3, 4.2.5, 4.2.10, 4.2.13 and Table 4.2.13a.

How big should a deck footing be?

Pad sizes

For a deck post on a Class A or S site with no roof on it, the building code’s stump table gives a 250 × 250 mm pad (300 mm round) up to 3 m² of deck, 400 × 400 mm (450 mm round) up to 8 m², and 450 × 450 mm (600 mm round) up to 12 m², each 250 mm deep. Past 12 m² a footing is an engineer’s.

Stump pad footings, no roof

Housing Provisions Table 4.2.13a: stumps under a single storey timber floor and metal roof, roof load area 0 m².

Minimum stump pad footings for Class A and S sites with no roof, by floor load area: ABCB Housing Provisions Table 4.2.13a
Floor area, up toSquare padRound padPad depth
3 m²250 × 250300250
8 m²400 × 400450250
12 m²450 × 450600250

Sizes in mm. The floor area is the patch of deck one post holds up: the post spacing times the strip of deck its bearer carries. Ground of at least 100 kPa. NCC 2022 and NCC 2025 print the same figures.

Pad footings under a clad house frame

Housing Provisions Table 4.2.13g: the area counts the floor, any roof and half the wall above.

Pad footings for a clad frame on Class A and S sites, by effective supported area: ABCB Housing Provisions Table 4.2.13g
Area, up toSquare padRound padThicknessDepth to base
10 m²400 × 400500200400
20 m²500 × 500600200400
30 m²600 × 600750250400

Sizes in mm. Without rodded, tamped backfill the pad is 50 mm thicker. Where a pad holds the deck against sideways or uplift forces, AS 2870 sets its size.

Both tables, and Timber Queensland’s post table, are built on a 1.5 kPa floor live load. AS/NZS 1170.1 sets 2.0 kPa plus a 1.8 kN point load for decks 1 m or more above the ground, so a deck that high should have its footings checked.

What size posts does a deck need?

Posts and stumps

A braced 90 × 90 F7 treated pine post carrying up to 5 m² of deck, with no roof, can stand up to 4,100 mm high in Timber Queensland’s table, 2,900 mm up to 10 m², and 2,300 mm up to 15 m². AS 1684 sizes a post from the deck area it carries, any roof area, its height and its stress grade. WoodSolutions says common post sizes start at 88 mm. A stump is a short post standing on or set into its footing, the usual support under a low deck.

Braced 90 × 90 F7 treated pine posts

Timber Queensland TDS 4 Table 2: no roof, wind up to N3 / C2.

Maximum height of a braced 90 × 90 F7 treated pine deck post with no roof, by floor area carried: Timber Queensland TDS 4 Table 2
Floor area, up toTallest post, mm
5 m²4,100
10 m²2,900
15 m²2,300

A stump sized from AS 1684’s stump table, or set in the ground with no bracing, stands no higher than 15 times its face width unless an engineer designs it: 1,350 mm for a 90 mm post.

The posts each frame stands on

The frames in the deck designer, from our catalogue.

Deck posts used by treated pine, steel and aluminium deck frames, and how each meets its footing
FramePostAt the footing
Treated pine90 × 90 H4 post, F7A hot-dip galvanised stirrup set in the concrete, with the post at least 75 mm above it.
Spantec Boxspan steelGalvanised SHS post 90 × 90 × 2.0 (Ezipier)An Ezipier base plate inside the post, on a concrete footing. Spantec leaves the footing design to your engineer.
InfraBuild DuraGal steelDuraGal SHS 90 × 90 × 2.0 pierAn SBC-90 pier bottom connection. The footing is to the engineer’s specification, finished 50 mm above the ground.
Clickdeck aluminiumClickdeck 55 post (55Post Kit, 600 mm); Clickdeck 100 × 100 postA post base bracket, bolted to a stable footing or concrete pad with masonry fixings.

Timber posts

On a stirrup, the post stands at least 75 mm above the concrete. Timber Queensland asks for H3 on framing more than 150 mm above the ground and H5 in the ground. The designer’s lists specify H4 posts.

A post in the ground is H5 or in-ground Class 1 hardwood, on 100 mm of coarse gravel, with the top of the fill sloped away. Freestanding decks higher than 1,800 mm are braced both ways.

Steel deck posts

Spantec’s Ezipier sheet lists 75 × 75 × 2, 89 × 89 × 3.5 or 90 × 90 × 2 SHS posts (G350), with the footing to your engineer’s specification. Spantec says Ezipier can generally be designed to 6 m high. The building code’s own steel stump is a 100 × 100 × 2.0 SHS (350 MPa) stump, up to 3,000 mm.

A steel stump is sealed with a welded top plate, set in concrete that slopes away and finishes at least 100 mm above the ground, and protected from corrosion. Where steel is set in concrete, InfraBuild asks for paint 100 mm above and below the concrete line. Near the sea the galvanising steps up: HDG75 at low risk, HDG225 more than 1 km from breaking surf, HDG450 more than 200 m away, HDG900 at 100 to 200 m.

Aluminium posts

Clickdeck posts bolt to a stable footing or concrete pad with masonry fixings, and its pedestals sit on a solid structural base. Clickdeck publishes no post height table, so its design guide and your engineer set the post.

Pad, bored pier, screw pile or post in concrete?

Footing types

A concrete pad suits a light deck on Class A or S ground. Bored piers and screw piles suit uplift, soft topsoil or a roof, and an engineer designs both. Pads spread the post’s load over a wider patch of soil. Piers and piles reach down to firmer ground and hold the deck down when wind tries to lift it.

Deck footing types compared: pad footing, bored pier, screw pile, post in concrete and pedestals
FootingWhat it isWhere it suitsWhat sets its size
Pad footingA shallow block of concrete under each post or stump.Class A and S ground under a light deck.The area it carries and the soil.
Bored pierA narrow, deep concrete cylinder drilled with an auger.Uplift from wind or a roof, or soft topsoil over firmer ground.An engineer’s design.
Screw pileA steel shaft with helical plates, screwed into the ground.Soft topsoil, uplift, and yards a concrete truck can’t reach.An engineer’s design to the piling standard, AS 2159.
Post in concreteA timber post cast into its footing.Decks braced by stumps set in the ground instead of cross-bracing.AS 1684, with H5 or in-ground Class 1 timber.
PedestalsAdjustable supports standing on a slab or pavers.Low decks close to the ground.The pedestal maker’s guide and the base under it.

When is it an engineer’s job?

Outside the tables

Whenever the deck is outside the published tables: reactive or problem ground, a roof, a spa, a footing carrying more than 12 m², or a deck 1 m or more up. Footing requirements also differ from one council to the next, so a certifier may ask for an engineer anyway.

The figures on this page are concept figures for planning and pricing, not a sign-off. Take them to your engineer or certifier before anything is poured.

  • Reactive or problem ground. Class M, H1, H2, E or P, or fill. The stump tables cover Class A and S only, so the footings go to AS 2870.
  • A roof or pergola over the deck. Timber Queensland asks for its footings to be engineer designed, for both bearing and uplift.
  • A spa, tiles or heavy planters. WoodSolutions sends a deck carrying a spa or tiles to a structural engineer. The building code says its 2 kPa deck load is not meant for spas.
  • Wind and uplift. Where a pad holds the deck against sideways or uplift forces, AS 2870 sets its size, not the pad table.
  • A footing carrying more than 12 m². That is past the end of the stump table.
  • A deck 1 m or more up. The deck load rises to 2.0 kPa plus a 1.8 kN point load, it needs a barrier, and more than 1 m up and fixed to the house, it needs two diagonally opposed 30 × 0.8 mm galvanised straps.
  • A freestanding deck over 1,800 mm. It is braced both ways, with double diagonal braces.
  • A deck fixed to the house. The building code’s waling plate rules cover a deck up to 3 m high that doesn’t cantilever off the wall. The designer stands the deck on its own posts along the house instead.
  • Sloping ground. The posts differ in height, and the tallest one sets the post size.

Where these figures come from

Every pad, depth and post height here is from a published document below. Where a document gives no figure, we leave it out. The layout of the posts comes from the designer’s engine and the same span tables as our span tables page.

The documents

Read and checked against these documents on .

Deck footing questions

How deep should deck footings be in Australia?

On a Class A or S site, the building code’s stump table gives a 250 mm pad footing depth for a deck post with no roof on it, and its house-frame pad table puts the base at least 400 mm below the ground. On loose sand or ground that erodes, at least 300 mm. Reactive clay, soft ground and uplift go deeper, to an engineer’s design.

How many footings does a deck need?

One under every post. For a 4.8 × 3.6 m deck 600 mm high on a treated pine frame, the designer lays out 10 footings on 3 bearer rows. Bigger bearers mean fewer posts, and the calculator above counts them for your deck.

What size concrete pad for a deck post?

For a post carrying up to 3 m² of deck, with no roof, on Class A or S ground: 250 × 250 mm or 300 mm round, 250 mm deep. Up to 8 m²: 400 × 400 mm or 450 mm round. Up to 12 m²: 450 × 450 mm or 600 mm round.

Can deck posts sit on the ground?

Not straight on the soil. Timber posts should stand on galvanised stirrups set in concrete, at least 75 mm above it. A post that goes into the ground is H5 or in-ground Class 1 hardwood, on 100 mm of coarse gravel. A low deck can sit on adjustable pedestals on a slab or pavers instead.

Should deck posts be set in concrete?

Timber Queensland says timber posts should preferably go on galvanised stirrups set in concrete. If you do set them in, use H5 or in-ground Class 1 timber, put 100 mm of coarse gravel in the hole first, slope the top away, and embed each at least 450 mm or 30% of its height above ground.

Do I need a soil test for a deck?

You need the site class to use the pad tables, because they cover Class A and S ground only. A soil test, or the site classification for your house, gives it. On any other class an engineer designs the footings, often from a soil test.

How far apart should deck posts be?

The bearer’s span table sets it: a bigger bearer, or a narrower strip of deck on it, lets the posts go further apart. Look up your bearer in the deck span tables.

What size steel posts for a deck?

The steel frames in the designer stand on 90 × 90 × 2.0 mm galvanised SHS posts. Spantec’s Ezipier sheet also lists 75 × 75 × 2 and 89 × 89 × 3.5 SHS, and the building code’s own steel stump is 100 × 100 × 2.0 SHS, up to 3,000 mm. The pier maker or your engineer sizes the post for your loads.