Composite screening is a set of slim composite slats screwed across posts to make a privacy screen, and the posts do all the structural work. The makers' guides put the posts no more than 900 mm apart for a thin solid slat1, or 800 mm in another guide4. Those guides, and a third, say the slats are for screening only, never a balustrade or a structural part. On a deck, I'd run the posts down to their own footings rather than hang the screen off the deck frame, and nothing should be fixed to the deck boards.
What is composite screening?
It is the same wood fibre and plastic mix as composite decking, made in smaller profiles for screens and fences. The Australian guides cover these kinds:
- Thin solid slats, flat and narrow, like a slimmed-down decking board. Every screening guide cited here includes one.
- Hollow slats, deeper from front to back. They look chunkier and span further between posts.
- Panels, either factory-made frames of battens or wide interlocking boards that close the screen up completely.
All of them hang off a frame of posts and, in some systems, rails. None of them is made to be freestanding, and the guides are blunt about it. One says its screening "is not designed to be a freestanding product" and must go on fixed posts1. Another lists safety balustrades and structural elements among the uses it doesn't recommend5. A third says its boards are for cosmetic screening, "not barrier or rail applications"4.
That last point matters on a raised deck. Where a deck is high enough to need a balustrade, a composite screen can run alongside it, but it can't replace it.
How far apart should privacy screen posts be?
For a thin solid slat, no more than 800 mm4 or 900 mm1 between post centres, depending on whose slat you buy. A third maker's thin slat also sits at 900 mm5. Deeper hollow slats go further. These are the figures in the current guides:
| Screening | Posts at most | Gap between pieces |
|---|---|---|
| Thin solid slat | 900 mm centres1 | At least 2 mm1 |
| Thin solid slat, second maker | 800 mm centres4 | At least 8 mm when face-screwed4 |
| Hollow slat | 1200 mm centres5 | At least 5 mm5 |
| Batten panel | 900 mm centres for posts or rails2 | 2 mm between panels set vertically, 5 mm set horizontally2 |
Treat each post spacing as a maximum. Closer is always fine, and I'd go closer on a screen that faces the afternoon sun. Slats can bow slightly between posts when the sun heats one face more than the other1, and the guides call it normal for the material rather than a fault5. A shorter span between posts gives the slat less length to bow over.
How a slat runs across the posts matters too. One guide wants every slat fixed to at least three posts, so no piece spans one bay by itself1. Another allows a slat across one bay but asks for two fasteners at each post when you do it4. Slats that run up and down are fixed to rails instead of posts, and that guide gives 800 mm as the most for its thinnest slat between rails4.
How much gap should you leave between screening slats?
The gaps in the table are the least the makers allow, or for the panels the gap their maker recommends. They aren't a privacy setting. Composite grows and shrinks along its length with temperature, so the guides also want a gap at the ends. One asks for a tight 1 mm end gap if you fix on a hot day and 3 mm on a cool one1. Another notes that a board sitting in full sun runs about 20–25 °C hotter than the air4, and recommends fixing when it's cooler than 25 °C and the boards aren't sitting in the sun4. My guide to expansion gaps explains the movement on a deck, and a screen behaves the same way.
Above the minimum, the gap is your choice. One maker's own wording is that battens "can be spaced to suit the level of privacy, shade or airflow required"7. A tight gap blocks the view when you look straight at it, while a wider one lets in light and breeze and lets more of the wind pass through the screen. I'd hold two offcuts up with a gap between them and look through from where the neighbour would be standing before deciding. Then cut a spacer to that size and use it on every slat, because a gap that wanders by a few millimetres shows from across the yard.
Keep the bottom slat clear of whatever is underneath. The guides ask for at least 50 mm off the ground5, or 150 mm in one of them4. On a deck I'd give the bottom slat the same space above the boards, so leaves and water can get out.
How high should a deck privacy screen be?
Tall enough to block the view that bothers you from where you'll sit. Then check that height against what the posts and their footings were designed to carry. On a raised deck the screen starts at the deck boards. Its top sits as far above the lawn as the deck height plus the screen, and a screen that would be ordinary on the ground becomes a big sail up there.
The makers' systems set limits of their own. One maker's aluminium post system is sold for fences and screens up to 1800 mm high, with posts no more than 1800 mm apart7. Another guide caps a screen fixed with hidden clips at 2400 mm above ground level4. Both are written for screens that start at the ground. The clip limit is measured from ground level, so on a raised deck the deck's own height counts towards it.
Height is also where the council and the neighbours come in. Whether your screen needs approval, on a raised deck or near a boundary, is a question for your council before you buy anything. If the screen will face a neighbour's yard, I'd show them the plan as well.
Will a privacy screen on a deck stand up to wind?
Only if the posts, and whatever the posts are fixed to, can take the push. A slatted screen catches the wind like a sail, and the more solid and taller it is, the harder the wind pushes. All of that load ends up in the posts and then in the footings or the frame below them.
The makers leave that design to you. One puts the responsibility for deciding whether any use of its products is suitable and safe on the homeowner or installer1. The same guide wants posts that meet the building code and are securely anchored to the ground, "not floating"1. Another, writing about raising a fence with screening, says you'll need to consider the existing framing and reinforce it if necessary, "because of extra wind load and weight"6. One guide wants rigid uprights fixed at the base, with 65 x 65 mm steel or 90 x 90 mm timber as its examples of the minimum4. Its boards must not be used as the upright.
Owners notice the weight too. One ModWood buyer, Dave from New South Wales, ordered battens for a screening project and found them heavier than he expected. In May 2025, in a review the maker had invited him to write, he said: "make sure your posts can handle the load"8.
For a tall screen on an exposed block, near the coast or on a hill with nothing behind it, I'd have an engineer size the posts and footings. The answer depends on your wind region and how open the screen is, and I wouldn't guess at it.
Fixing screen posts: to the deck frame or their own footings?
The cleanest answer is a post with its own footing. The posts run down beside the deck, or through it, into concrete, and the deck frame carries none of the screen's wind load. One maker's suggested frame for its batten panels uses 90 x 90 mm treated pine posts set at least 600 mm into the ground, and notes that the exact depth comes from the building code2. An aluminium post system goes into holes at least 300 mm across and 700 mm deep7. For timber in the ground, my guide to H3 or H4 treated pine explains why a structural post needs more than H4.
Fixing a screen post to the deck frame is possible, but it's a different structure. A post bolted to the side of a joist or bearer works as a lever. Wind on the top of the screen tries to twist it. The bolts and the timber behind them have to resist that twist. A deck frame is designed to carry people standing on it. I wouldn't ask it to take a sideways push high above it without an engineer's detail for the bolts, the blocking and the joist they land on. Where a deck post already sits on the screen line, an engineer can tell you whether it's worth extending up through the deck. My guide to building a deck frame covers the posts and footings under the deck itself.
What never works is fixing to the deck boards. One decking maker says structural elements such as balustrades and pergolas shouldn't be fastened to its boards alone3. They go through the boards into the subframe or another adequate support, with clearance around the fixing for the boards to move3. A screen post is the same kind of load, so I'd plan its position before the boards go down and cut the boards around it.
Against a house wall, the slats can't go straight onto the brick. One guide rules out fixing its screening directly to concrete or brick1, and another asks for at least 45 mm between the back of the boards and the wall4. Build a frame off the wall and fix to that.
How do you fix composite screening slats?
Pre-drill every hole, slightly bigger than the screw, so the slat can move on it. For timber posts, one guide calls for stainless steel 8g x 40 mm screws, with every hole pre-drilled and countersunk, and doesn't recommend nailing1. Another asks for stainless 8g x 50 mm or 10g x 65 mm screws into timber and 10g x 40 mm self-tapping screws into metal posts5. My guide to decking screws explains the stainless grades.
Fix from one end of the slat and work along it. One maker says fixing both ends first and then the middle posts builds stress into the board4. The same guide keeps screws at least 15 mm from the end of a board4. Drive each screw until the head sits flush with the face and stop there, because the same guide says not to overdrive them4.
A screen around a pool is a separate question. A pool barrier has its own rules, and my pool decking guide covers how the deck and the fence meet.
What I'd do
Choose the slat first and download its guide, because the post spacing comes from the slat. Mark the posts at the guide's figure or closer, and closer again on a sunny west or north face. My preference is posts on their own footings. If they have to go on the deck frame, get an engineer's detail first. Talk to the council and the neighbour about the height before you order, and have an engineer look at a tall screen on an exposed site. On the day, use one spacer for every gap, work along each slat from one end and fix in the cool of the morning if you can. Before any of that, draw the deck in the deck designer and mark the screen posts on its concept plan by hand, because the designer doesn't draw screens yet.
