To build a deck, work from the ground up in a fixed order. Check whether it needs approval and draw the plan. Then pour the footings, stand the posts and fix the bearers and joists. Protect the frame before you lay the boards. Stairs and a balustrade go on last, where the height calls for them. The order is the same under timber and composite boards. Composite changes the joist spacing and the way the boards are spaced and fixed.
How to build a deck, step by step
Build in this order. Each step has its own section below.
- Check whether the deck needs approval.
- Choose the spot, the height and the size.
- Draw the plan and work out the materials.
- Set out the deck and pour the footings.
- Stand the posts and fix the bearers.
- Fix the joists and the blocking.
- Protect the frame.
- Lay the boards.
- Add stairs and a balustrade where the height calls for them.
- Finish the deck and clean it.
Step 1: check whether the deck needs approval
Ask before you buy anything, because the answer can change the design. The rules differ in every state. They turn mostly on how high the floor sits above the ground, how big the deck is and whether it carries a roof. My guide to deck building permits sets out each state's rule, and a private certifier or building surveyor can tell you where your deck falls.
Step 2: choose the spot, the height and the size
Settle the height first, because it decides how much frame you need and whether there are steps and a balustrade. Measure from the ground to the door sill, then measure the ground at each edge where the deck will finish. Where it is possible to fall 1 m or more from the deck, the building code requires a barrier along that edge2. At the low end, WoodSolutions' guide to domestic timber decks treats boards less than 400 mm off the ground as a deck close to the ground, which needs more ventilation, drainage and durability1. A deck between those two heights is the simplest one to build.
Step 3: draw the plan and work out the materials
Draw the deck to scale with every post, bearer and joist on it, then count the materials off the drawing. Choose the boards before the frame, because the board sets how far apart the joists go. Under AS 1684, the timber framing standard, standard grade hardwood boards 19 mm thick can span up to 500 mm between joists, and standard grade treated pine boards of the same thickness 400 mm1. Composite boards carry their own figure from the maker, and one manual sets 450 mm for a house deck4. My joist spacing guide compares the makers' figures.
Bearer and joist sizes come from span tables. Our deck span tables give joist and bearer spans for pine, steel and aluminium frames, checked against the frame makers' published figures.
The free deck designer draws a frame under your outline and lists the materials, and the free deck plans open in it at common sizes. For a plain rectangle, the calculators count the boards and joists. Each gives you a concept plan, and a builder or certifier must check your plan before you order.
Step 4: set out the deck and pour the footings
Mark the outline with string lines, square it, then dig and pour a footing under every post. The corners are square when both diagonals measure the same. Find out where the pipes and cables run before you dig.
WoodSolutions says footing design is set out in AS 2870 or AS 1684, and that the soil classification and the deck's loads usually need to be known first1. The most common footing is concrete, with a galvanised stirrup set in the top to hold the post. Our deck footings calculator lays out the footings for a deck's size and height, and sizes each pad from the building code's table. A deck that carries a spa or tiles is outside the standard tables and needs a structural engineer.
Step 5: stand the posts and fix the bearers
Stand a post in each stirrup, brace it plumb, then fix the bearers across the posts in straight, level rows. WoodSolutions' stirrup detail keeps the foot of the post at least 75 mm above the finished ground, which leaves a gap for termite inspection1. The guide says posts usually start at 88 mm across, and that a deck can stand no higher than 15 times the face width of its posts1. Posts need bracing as well, either with cross-braces between them or by setting stumps into their footings.
A bearer's size depends on the span between posts and on the width of deck it carries, so take it from the span tables. Run each bearer in one long length over three or more posts where you can, and make any join over a post.
Decide here how the deck meets the house. WoodSolutions calls the fixing of decks to buildings a common source of deck failure, and recommends carrying the deck on posts or piers of its own. A deck that hangs off the wall follows the building code's rules for that connection or goes to a structural engineer.
Step 6: fix the joists and the blocking
Fix the joists across the bearers at the spacing your boards need, measured centre to centre. WoodSolutions recommends joists at least 45 mm wide in seasoned hardwood or treated pine, so the board fixings don't split them1. Any join in a joist sits over a bearer, with at least 30 mm of bearing for each piece1.
Composite changes this step more than any other. The joists usually sit closer than they would under hardwood, with a doubled joist wherever two boards meet end to end. Short blocking between the joists stiffens the frame and carries any border or breaker board. Level the joist tops with a string line, because composite boards follow every hump under them. My guide to building a deck frame for composite decking covers each of these.
Step 7: protect the frame before the boards go on
Treat and seal the frame now, while you can still reach it. Timber above the ground should be hardwood rated above-ground durability Class 1 or 2, or pine treated to at least H31. A post set in the ground needs H5 treatment or an in-ground Class 1 hardwood1. Bolts, screws, nails and brackets should be hot-dip galvanised or stainless steel. The guide rules out electroplated fixings because the plating breaks down early. Within 1 km of the coast, or inside a pool's splash zone, which it puts at a minimum of 1 m from the pool's edge, it says the fixings must be stainless steel1.
Seal every cut end as you go, since the same guide lists unsealed cuts among the common deck problems. It also says a protection strip laid along the top of a joist will increase the joist's service life. H3 or H4 treated pine covers which grade goes where.
Step 8: lay the boards
Set the first board straight on a string line, then fix every board at every joist. Timber boards take at least two nails or screws at each joist, in pre-drilled holes kept at least 12 mm from the edges and ends1. WoodSolutions calls a gap of 3–4 mm between timber boards ideal over the long term, and keeps the boards 10 mm clear of the house wall so water can drain1. Coat timber boards on every face and cut end, preferably before you fix them.
Most composite boards fix with hidden clips in a grooved edge, and the clips set the side gap for you. The end gaps are yours to set from the maker's table for the temperature on the day, because composite grows and shrinks along its length with heat. How to install composite decking has the full order, and I compare the fixings in hidden clips vs face screws. The gap tables are in expansion gaps. A picture frame border hides the cut ends, and it needs its blocking in place before the boards go down.
Step 9: add stairs and a balustrade where the height calls for them
Height triggers both. A barrier on a deck with a fall of 1 m or more has to be at least 1 m high above the deck floor2. Its openings must not let a 125 mm sphere through2. Most states' no-approval limits stop at the same height above the ground, so a deck any higher usually needs approval as well.
Stepping straight off the deck onto the lawn is one riser, and 2 or more risers make a stairway under the building code3. A stairway's risers and goings have set limits and must stay constant through the flight. Balustrade posts fix to the frame, so plan their blocking before the boards cover it. Composite decking stairs covers the stringers and the rules that size them.
Step 10: finish the deck and give it a first clean
Sweep the deck as soon as the last board is down. WoodSolutions warns that iron filings left on timber react with moisture and leave black stains, and advises against cutting metal or masonry near an uncovered deck. On timber boards it prefers penetrating finishes, such as decking oils, to film-forming ones because of the wear from foot traffic. How to oil a deck covers when and how often. Composite boards get a wash in place of the oil, and how to clean composite decking covers what to use.
What tools do you need to build a deck?
Mostly hand tools and two saws. For a timber frame with timber or composite boards I'd have these on site:
- String line, pegs, a long tape measure, a builder's square and a long spirit level.
- A post-hole shovel, or a hired auger if there are many holes.
- A circular saw and a drop saw.
- A cordless drill, an impact driver and a socket set for the bolts.
- A hammer, clamps and a brush for the end sealer.
- Safety glasses, ear protection, gloves and a dust mask.
A Whirlpool member, Punchcard, who had built a deck of 45 m², advised a first-timer in January 2015 to buy a cordless impact driver, which "made the job ridiculously easier than a standard drill"5. Sawing treated pine makes dust you shouldn't breathe, and treated pine decking covers how to cut it safely.
Can I build my own deck?
In most states a competent owner can build a low deck that doesn't need a permit. Some states put a value threshold on owner-building, and above it you need the state's owner-builder permit or approval. Wherever a permit is needed, a licensed or registered builder is the plain route. The permits guide linked in step 1 has each state's position.
WoodSolutions' guide says a structural engineer must be consulted where a deck has to take heavier loads such as tiles or a spa1. I'd add any deck that is high, on a slope or hung off a wall you can't see into.
How to build a low deck, or a deck on the ground
Build it for damp, because a low deck gets little ventilation. Once the boards are less than 400 mm off the ground, WoodSolutions asks for more ventilation and drainage, more durable timber and access for termite inspection1. Framing timber that sits on the ground, or lower than 150 mm above it, should be treated to H4 or better1. Slope the ground so water can't pool, and keep the perimeter of the deck open to the air.
For a deck right on the ground, the guide shows joists sitting on concrete beams, or bearers laid on compacted gravel or sand over plastic sheeting. It also asks for a gap of at least 40 mm between the deck and the house for pest inspection and air flow1. Composite makers set their own minimum clearances, which my guide to building a ground-level composite deck compares.
Common questions
How hard is it to build a deck?
The carpentry is mostly straight cuts and screws. The hard parts are the digging, placing every footing and levelling the frame. A low rectangle on its own posts is a realistic first deck, and I'd hand a high or sloping one to a builder.
How long does building a deck take?
I don't have a reliable figure to give. It depends on the size of the deck, the number of holes and how many people are helping. The digging and the footings are the slow part.
How do I build a floating deck?
People use the name for a low, freestanding deck that isn't fixed to the house. Build it like any other deck on its own posts, and follow the low-deck section above.
Does composite decking change how you build the deck?
Only above the bearers. The joists sit closer together and are doubled under butt joins, the boards usually fix with clips, and the end gaps follow the maker's temperature table.
What goes wrong most often on a do it yourself deck?
WoodSolutions' list of common problems starts with a frame that can't hold itself up or is poorly connected to the house. Fasteners that are the wrong size or not durable enough come next, then timber with the wrong treatment for its exposure.
What I'd do
Measure the height at the door and at the far edge, then check the approval rules for your state. Draw the deck in the designer with the board you want, so the joists are at that board's spacing from the start. Take the concept plan to a builder or certifier before you order. Then spend most of your care on the footings and the frame, because the boards end up only as flat as what is under them.